RMB Facility Management AG References

Hotel Motel One, Zürich

Innert kurzer Zeit wurde das ehemalige Bürogebäude in ein Hotel mit 400 Zimmern umgenutzt. Das komplexe Projekt forderte anspruchsvolle technische und räumliche Koordination.

Baur au Lac Hotel, Zurich

The hotel’s complete energy supply was renewed along with 25 suites, 4 function rooms and the garden pavillion. It now meets the highest aesthetic and technical standards.

Hürlimann Estate, Zurich

Strategy for the site’s energy supply, optimisation of existing district pipelines, pipeline construction with plastic jacket pipes, drinking water catchment, distribution pipelines.

Hard Turm Park, Swiss Stock Exchange, Zurich

Thanks to the excellent collaboration between the owners, we managed to meet the diverse and complex security and air-conditioning requirements.

Zur Schanze High-Rise, Talstrasse 65, Zurich

After the addition of five stories to this now 18-storey building, an accounting model was developed that allows for the allocation of operational and overhead costs.

Waldhaus Hotel, Birsfelden

The restaurant and the function rooms were refurbished. The hotel rooms on the 1st and 2nd floors were renovated (incl. bathrooms).

Hirslanden Clinic, Zurich

During the renovation and extension process, the clinic continues to operate at normal capacity.

Neumarkt Shopping Centre, Brugg

40 years after its construction, the Neumarkt is being redesigned to improve its customer and user friendliness and to meet current environmental standards.

Niederhofrain Replacement Building, Zollikon

A monovalent heat pump system with ten geothermal probes that are also used for cooling in the summer and controlled residential ventilation create a pleasant indoor climate.

Swiss Obstgarten HQ, Kloten

After 35 years, this 1,200-workplace building was completely renovated and one storey added. The climate plan is flexible and complemented with a superordinate control station.

Turm Estate, Winterthur

Replacement of building automation system without halting operations, including integrating existing LON controllers into the overall system and BACnet implementation according to KBOB guidelines.

Wiesenthal School, Baar

“Domino”, the replacement building in timber, meets the “Minergie A” standard and will be built until 2027 without the school closing.